What are you searching for?

Civil engineering

Oberhausen, Hessenstraße

Separation of wastewater and river water

Wirfus

Sewage treatment plant

Burgweg in Bonn

Reconstruction and expansion of the combined sewer

Cologne A1

Construction of basin 3 with associated pumping station

Neuss RKB

Construction of a new storage sewer with rainwater clarifier

Arcelor Mittal, Duisburg

Construction of a railway bridge

Cologne INEOS

Replacement of underground sections of the LDF ship unloading pipeline

Gau-Bickelheim, Sutter plant II

Earthworks for the new plant II and construction of a sewage treatment plant

Mutterstadt

Extension of Blockfeld stormwater retention tank

Hasenstraße in Oberhausen

Construction of a new stormwater retention tank and sewer reconstruction

Heiligkreuzsteinach

New construction of elevated tank Steinwaldquelle

An der Lindenmühle, Bad Kreuznach

Extension of flood control pumping station for sewage treatment plant

Bad Vilbel sewage treatment plant

process water treatment

Thörlingen

Baybachtal wastewater treatment plant, lot 1 stormwater overflow basin

Wiesbaden-Erbenheim

New construction of Ländchesbahn bridge

Frankenberg

Railway crossing at Berleburgerstraße

Esslingen am Neckar

Hanns-Martin-Schleyer bridge culvert, full cut driving under compressed air, civil engineering and foundation construction (drill-foundation piles)

Sinzig-Bad Bodendorf

Construction of a new railway bridge

Essen

“Wolfsbachtal Sammler” collector in the nature reserve

Offenbach

Production of stairs