Extension of flood control pumping station for sewage treatment plant
- Client
- Wastewater removal for Bad Kreuznach
- Scope of services
- Upstand discharge structure approx. 11 x 1.20 x 1.01 m of in-situ concrete; flood control pumping station building, approx. 7.20 x 3 x 3.80 m as a prefabricated construction
- Special feature
-
Area subject to flooding, construction site temporarily flooded, additional safety measures, pumping station in operation