process water treatment
Construction of a process water treatment facility consisting of two centrate tanks (300 m³ volume each), one deammonification basin (162 m³ volume), one powerhouse/pump station
- Client
- Bad Vilbel
- Scope of services
- Powerhouse 9.75 x 6.74 x 3.20 m, basement 11.98 x 6.74 x 2.75 m; deammonification basin 9.80 x 5.30 x 5.25 m, 8 cast driven piles; 2 round centrate tanks dia. 7.30 m, H 11.15 m; Sewage construction work: One sliding shaft, six reinforced concrete shafts, 108 m DN 300 sewer, 80 m DN 150 empty pipes, 250 m thermally insulated supply lines DA 160–DA 180, 3,600 m² sheet piling, 1,800 m³ excavated earth, 720 m³ in-situ concrete, 80 t steel