Microtunnelling with compressed air
Zug-Nord, Switzerland
District heating in Central Switzerland
Wuppertal, Industriestraße
Creation of a culvert pipeline
Mainova Frankfurt, district heating supply line
(FW VL) for Messe combined heating and power plant (HKW), second construction stage
Castrop Rauxel
New construction of the stormwater treatment
Esslingen am Neckar, Hanns-Martin-Schleyer Bridge culvert
Full cut driving under compressed air, civil engineering and foundation construction (drill-foundation piles)
Waldkraiburg – gas pipeline MONACO
second and fourth construction stage
Mannheim, Old Rhine culvert/waste-to-energy plant
Construction of a new Old Rhine culvert in Mannheim at river km 4.4
Viersen, deep collector
Construction of a 2.5 km long underground rainwater retention channel
Cologne, Rhine culvert 2.0 Rhine crossing
Construction of the new connection
Münster, Grael-Düker
New culvert under the Dortmund-Ems-Canal
Essen
“Wolfsbachtal Sammler” collector in the nature reserve