What are you searching for?

Microtunnelling with compressed air

Zug-Nord, Switzerland

District heating in Central Switzerland

Wuppertal, Industriestraße

Creation of a culvert pipeline

Mainova Frankfurt, district heating supply line

(FW VL) for Messe combined heating and power plant (HKW), second construction stage

Castrop Rauxel

New construction of the stormwater treatment

Esslingen am Neckar, Hanns-Martin-Schleyer Bridge culvert

Full cut driving under compressed air, civil engineering and foundation construction (drill-foundation piles)

Waldkraiburg – gas pipeline MONACO

second and fourth construction stage

Mannheim, Old Rhine culvert/waste-to-energy plant

Construction of a new Old Rhine culvert in Mannheim at river km 4.4

Viersen, deep collector

Construction of a 2.5 km long underground rainwater retention channel

Cologne, Rhine culvert 2.0 Rhine crossing

Construction of the new connection

Münster, Grael-Düker

New culvert under the Dortmund-Ems-Canal

Essen

“Wolfsbachtal Sammler” collector in the nature reserve