Full cut driving under compressed air, civil engineering and foundation construction (drill-foundation piles)
- Client
- EnBW Energie Baden-Württemberg AG
- Scope of services
- 185 m pipe jacking DN 2600 / DA 3200
- Geology
- Sandstone, shale, gypsum keuper
- Special feature
- Pipe jacking with compressed air under the Neckar River; underwater concreting at start and target pits (approx. 410 m³)