Foundation construction

Frankfurt

South collector 2nd construction stage

Mönchengladbach-Hehn K4

Construction of a new DN 1200 combined sewer using the pipe jacking method

IGM Fassaden Medard, plant III

Earthworks for the new plant III, bored pile wall, vibrating stop logs and sewer construction

Neuwied-Engers

Reinforcement of the Rhine dyke

Hasenstraße in Oberhausen

Construction of a new stormwater retention tank and sewer reconstruction

Esslingen am Neckar

Hanns-Martin-Schleyer Bridge culvert, full cut driving under compressed air, civil engineering and foundation construction (bored piles)

Oberhausen, Hessenstraße

Separation of wastewater and river water

Oberhausen, Sterkrade

Sterkrade main sewer, first construction stage

Heckteichstraße in Düsseldorf

Sewer reconstruction

Essen

“Wolfsbachtal Sammler” collector in the nature reserve

Wiesbaden, Salzbach bridge A66

Sheet piling and drilled beams as visual protection and excavation protection

Cologne, Rhine culvert 2.0 Rhine crossing

Construction of the new connection between the water supply network on the left and right sides of the Rhine

Mühlgasse in Rockenberg

Construction of a storage sewer with connection and conversion of a pumping station

Lehmen fish ladder

FWA Lehmen weir, installation of transverse trench

Wuppertal, Industriestraße

Creation of a culvert pipeline

Taunusstein

Brita Neubau CT 1

Oberhausen, Sterkrade

Construction of sewer including storm water treatment, 2nd construction stage

Hofgartenplatz in Wiesbaden-Sonnenberg

Construction of a relief sewer, redesign of the Hofgartenplatz, renovation of a bridge structure

Rheinstraße in Eich

Construction of a new pumping station

Viersen

Erection of a deep collector

Wiesbaden

Gallery construction

Gerhardstraße in Bonn

Relocation of sewer

Bahnholzstraße in Wiesbaden

Construction of a retaining wall to secure a steep slope

Heidelberg

Sewer jacking Newtonstraße Ost

Lampertheim

Construction of a rainwater clarifier with sheet pile trench and concrete construction

Mutterstadt

Extension of Blockfeld stormwater retention tank

Cologne A1

Construction of basin 3 with associated pumping station