Foundation construction
Frankfurt
South collector 2nd construction stage
Mönchengladbach-Hehn K4
Construction of a new DN 1200 combined sewer using the pipe jacking method
IGM Fassaden Medard, plant III
Earthworks for the new plant III, bored pile wall, vibrating stop logs and sewer construction
Neuwied-Engers
Reinforcement of the Rhine dyke
Hasenstraße in Oberhausen
Construction of a new stormwater retention tank and sewer reconstruction
Esslingen am Neckar
Hanns-Martin-Schleyer Bridge culvert, full cut driving under compressed air, civil engineering and foundation construction (bored piles)
Oberhausen, Hessenstraße
Separation of wastewater and river water
Oberhausen, Sterkrade
Sterkrade main sewer, first construction stage
Heckteichstraße in Düsseldorf
Sewer reconstruction
Essen
“Wolfsbachtal Sammler” collector in the nature reserve
Wiesbaden, Salzbach bridge A66
Sheet piling and drilled beams as visual protection and excavation protection
Cologne, Rhine culvert 2.0 Rhine crossing
Construction of the new connection between the water supply network on the left and right sides of the Rhine
Mühlgasse in Rockenberg
Construction of a storage sewer with connection and conversion of a pumping station
Lehmen fish ladder
FWA Lehmen weir, installation of transverse trench
Wuppertal, Industriestraße
Creation of a culvert pipeline
Taunusstein
Brita Neubau CT 1
Oberhausen, Sterkrade
Construction of sewer including storm water treatment, 2nd construction stage
Hofgartenplatz in Wiesbaden-Sonnenberg
Construction of a relief sewer, redesign of the Hofgartenplatz, renovation of a bridge structure
Rheinstraße in Eich
Construction of a new pumping station
Viersen
Erection of a deep collector
Wiesbaden
Gallery construction
Gerhardstraße in Bonn
Relocation of sewer
Bahnholzstraße in Wiesbaden
Construction of a retaining wall to secure a steep slope
Heidelberg
Sewer jacking Newtonstraße Ost
Lampertheim
Construction of a rainwater clarifier with sheet pile trench and concrete construction
Mutterstadt
Extension of Blockfeld stormwater retention tank
Cologne A1
Construction of basin 3 with associated pumping station