IGM Fassaden Medard, plant III

Earthworks for the new plant III, bored pile wall, vibrating stop logs and sewer construction

Client
IGM Holding GmbH, Medard
Scope of services
180 m trench profile construction, 18 m jacking DN 600, 150 m bored pile wall, 170 m filling bar railing, 2 bridge structures for crossings, 588 m cantilever retaining wall, 161 m PVC pipes DN 250, 625 m reinforced concrete pipes DN 300, DN 400 and DN 500, 19 shafts DN 1000 and DN 2000, 45 road gullies, 11,730 m² asphalt work, 4,130 m vibrating stop logs, 26,400 m² soil application/removal, soil improvement