Construction of new stormwater overflow basin and reconstruction of existing plant
- Client
- Stadtwerke Kronberg (municipal utilities)
- Scope of services
- 300 m² corner girder shoring/linear shoring, 27 m GRP pipes DN 600 and PP pipes DN 400, one separating structure as a prefabricated structure, one conversion of a regulation plant in the existing building, one conversion of a separating structure in the existing building