Earthworks for the new plant II and construction of a sewage treatment plant
- Client
- Sutter 6. Real Estate GmbH, Gau-Bickelheim
- Scope of services
- 25,000 m³ top soil removal, 40,000 m³ soil removal/application, 304 single foundations, 800 m strip foundations; Sewage treatment plant: 5,200 m³ soil removal, construction of a septic tank 27 x 47 x 6 m, construction of an operations building 6.80 x 47 x 4 m, 170 m pressure line 125